ILIJAN POWER PLANT PDF

0 Comment

Project name: Ilijan Power Plant (Kepco Ilijan Corporation), Project id: Country: Philippines, Location: Province of Batangas, Batangas. Financial Closure. Ilijan CCGT Power Plant Philippines is located at Ilijan, Batangas City, Philippines. Location coordinates are: Latitude= , Longitude. Type: Gas Power Plant; Area: Luzon, Batangas; Kind of Fuel: Natural Gas; Origin of Fuel: Malampaya Gas Field; Power Capacity: 1, MW (6.

Author: Zulusida Fenrikree
Country: Anguilla
Language: English (Spanish)
Genre: Marketing
Published (Last): 28 May 2007
Pages: 445
PDF File Size: 6.63 Mb
ePub File Size: 10.2 Mb
ISBN: 663-6-40249-816-8
Downloads: 31873
Price: Free* [*Free Regsitration Required]
Uploader: Vorn

Each unit is composed of gas turbine, steam turbine generator and the corresponding heat recovery steam generator. It was literally carved out of the Philippine jungle by an international consortium of developers, engineers, and contractors.

They consist of a rotor cooling circuit and four stationary vane-cooling circuits. During natural gas firing, one operates while the other two remain on standby.

Ilijan combined-cycle project operational summary Source: From there, the gas is transported through a in-diameter onshore pipeline running 9 miles to the plant. Rita plant such as the tank farm and fuel jetty, thus reducing the need to duplicate various operational facilities. The blade passage temperature and mechanical vibration of all four GTs were maintained within satisfactory levels. This is the first G placed into commercial service outside Japan.

First G series turbine outside Japan The Mitsubishi G series gas turbines Figure 3 operate with a turbine inlet temperature of 2,F and use steam to cool their combustor liners.

TOP Related Posts  CCNA CHAPTER 1 ANSWERS PDF

The water treatment system works in three stages: By continuing to use this website, you agree to their use. But for Ilijan, the end justified the means. You are commenting using your Facebook account. Obstacles that developers of plants in the U. Commercial operation was in October 1, The plant has two power blocks, plajt a 2 x 1 configuration based on the Mitsubishi G gas turbine.

Ilijan Gas Power Plant

However, the combustor exit temperatures are different. The plant was operated on liquid fuel gas oil, naptha, condensate until the end of The Mitsubishi G series gas turbines Figure 3 operate with a turbine inlet temperature of 2,F and use steam to cool their combustor liners.

San Lorenzo power plant started using liquid fuel gas oil, naptha, condensate for testing and commissioning by late Liquid fuel was used as back-up fuel thereafter. Commercial operations using natural gas as the primary fuel commenced on January 1, Those figures are remarkable, considering the remoteness of the project and the extensive infrastructure that had to be built to support it see table.

Cooling circuits for illijan turbine section are similar to those of the F ilijn. Each gas turbine generator has a nominal expected gross rated output of MW and MW for each of the turbine generators. In addition, all the plant water has to be made from seawater, including NOx injection water. San Miguel Energy Corporation who was declared as the highest bidder last 16 April won the administration of the 1, MW Ilijan.

TOP Related Posts  700-HLT1Z24 PDF

The diesel is stored in three on-site storage tanks that are replenished through an offshore diesel fuel—unloading terminal.

Rita power plant to iilijan Calaca substation. Seawater is used for condenser cooling water. Two very significant obstacles had to be overcome to complete the project. The power station uses diesel as back-up fuel. The plant also share common facilities being used by the Sta. The 1,MW Ilijan combined-cycle plant is truly a greenfield poewr. First G series turbine outside Japan.

Ilijan Combined-Cycle Power Plant

Ground was broken on March 15,with the start of civil poaer works. Fill in your details below or click an icon to log in: The plant, which is designed to be dispatched Figure 2 and to operate at or near full load, consists of two MW nominal power blocks.

Direct compressor discharge air is used to cool the first-stage vane, while the compressor bleed air from intermediate stages is used as cooling air for the turbine blade ring cavities and for the second- third- and fourth-stage vanes.

The plant is located at Sta. Notify me of new comments via email. Ilijan combined-cycle project operational summary. Email required Address never made public.