AS9102 FORMS PDF

0 Comment

AS/EN/SJAC Rev B First Article Inspection Form 1: Part Number Accountability. Sheet of. Form 1. A, B, C, D. 1, 1. Part Number: 2. Part Name: 3. AS/EN/SJAC Rev A First Article Inspection Sheet 1 of _. Form 1: Part Number Accountability Form 1, Rev A, Date: Oct 31, This SAE Aerospace Standard (AS) establishes documentation requirements for the First Article Inspection (FAI).The purpose of the First Article Inspection is to.

Author: Yozshulkree Kecage
Country: Tunisia
Language: English (Spanish)
Genre: Video
Published (Last): 27 March 2010
Pages: 32
PDF File Size: 11.30 Mb
ePub File Size: 19.92 Mb
ISBN: 977-1-82857-176-1
Downloads: 95672
Price: Free* [*Free Regsitration Required]
Uploader: Tum

Some fields that might be considered conditionally required include drawing number, additional changes, and designing tool. The part number accountability form designates specific names, serial numbers, and FAI report numbers for parts used in both the design and manufacturing process.

There are several advantages to companies adhering to this new standard. frms

The AS document consolidates a series of forms to help ensure consistency across the board in aerospace technology and other engineering fields. Requirements for AS With all the specifications listed in the AS revision, and all the different fields that this form covers, it might seem difficult to understand which sections of the form must one complete before submitting it.

TOP Related Posts  EL COMPORTAMIENTO DEL INDIVIDUO EN LAS ORGANIZACIONES ADRIAN FURNHAM PDF

These measures help guarantee repeatability of the production of these products. This new revision was meant to consolidate multiple requirement forms as well as improve the process and organization of these forms. Filling out and tracking these forms help companies ensure validity and reliability forns introducing new parts.

Finally, characteristic accountability evaluates verification and compatibility. If something goes wrong in the process, the company can look back at the documentation zs9102 see exactly which part he needs to change.

Importance of AS The AS document consolidates a series of forms to help ensure consistency across the board in aerospace technology and other engineering fields.

Examples of optional information include the fkrms of the person who prepared the FAI, the name of the person who approved the FAI, the date FAI is reported, and the name of the customer who approved everything.

Next, product accountability includes citation of raw material specifications, special processes, and functional testing. This form helps an engineer validate the new process and demonstrates how this new process will be used along side existing methods.

TOP Related Posts  BERK AND DEMARZO CORPORATE FINANCE PDF

This form ws9102 all the characteristics of the part, including characteristic requirements and corresponding inspection results. The three AS forms are: With all the specifications listed in the AS revision, and all the different fields that this form covers, it might seem difficult to understand which sections of the form must one complete before submitting it.